Unit V Project
Instructions
As a continuation of our course project due in Unit VIII (a proposal for an industrial and hazardous waste treatment facility), complete the next (fifth) section (biological and secondary treatment) of your proposal by following the instructions carefully, and then submit your continued draft of your proposal into Blackboard for grading.
Instructions:
Closely read the Required Reading assignment from Bahadori (2014) and the Unit Lesson within the Study Guide.
Open your proposal draft from Unit III and make any improvements to your draft using your professors feedback from the Unit III project assignment.
Open the Unit V Study Guide, read the unit lesson, and then work with the embedded interactive model to decide what biological and secondary treatment equipment to include in your treatment process design.
Continue from your Unit III Project and make your fifth level one heading titled Biological and Secondary Treatment. Describe the secondary treatment equipment that you engineered into your treatment process. Be sure and describe the relevance and anticipated reduction of related analytical concentrations within your industrial and hazardous waste treatment system as they correspond with each technology that you selected.
You are required to describe the equipment selection in at least one page.